Transcript

like to welcome everybody who has actually come to campus to view this and everybody who's viewing it virtually thank you very much for taking time on your your busy schedule today to uh participate in this uh wonderful event and as Tom mentioned this is a special Master lecture series uh presentation in partnership with the Orange County uh chapter of the project management in uh Institute and it is definitely my pleasure to introduce our speaker today Greta blash uh Greta is a certified project manager holds an agile certification and business analyst certification from the project management Institute she has extensive experience as an executive and Consulting IT professional her areas of experience include program management project management agile scrum development with emphasis in the areas of system implementations and conversions and maybe she can explain what that is uh customer relationship management data warehousing and business intelligence uh Greta has taught project management certification courses worldwide uh and has served as vice president of education and programs for PMI Southern Nevada chapter she is uh currently and since uh 2012 served as the academic Outreach liaison for PMI region 7 her topic today is on effective project management and is titled the basics of good project management so I'll turn it over to you Greta and have fun thank you so much for having me here today I'm looking forward to being able to do this presentation and especially because it's a joint effort between the Orange County PMI chapter as well as Cal Southern University as we talk about the agenda obviously when you talk about the basics of good project management we probably need to go back and first identify what is a project and then what is project management and how it applies as a life skill as opposed to those of us that are professional project managers and I'm really not sure what that really means actually being a professional project manager uh depending on what we're doing what type of projects as see at LED I've done a lot of different types of projects in fact one of the things that I just did was I installed a phone system now why because I had to have it as part of a call center implementation that was part of a CRM project so depending on what has to be done you use the skills the basic skills of project management to manage those efforts we'll talk about the phases of a project and those of you that are actually PMI certified or project managers will realize I'm not using the formal project management terminology here talking about this as being something that people can do in their everyday life so we have a start starting part of a project we have a planning where we figure out what we need to do and how we're going to do it and then we actually do the work we perform the work and at some point in time we have to finish it now unfortunately most of us don't finish projects the way that we talk about being able to do so we'll spend a little bit of time on that one of the other areas that I want to talk about because project management is not just a technical skill but project management also has a lot to do with some of the competencies as an individual as a leader as a person and so one of the things that we all learn is that even if we can put together a Microsoft Project schedule we may not be successful in being able to do the project there's some additional skills that we need to have in order to do this so we'll talk about some of those competencies and the fact that PMI has actually added an entire appendix to our book that we use use to be able to talk about these various skills the last thing that I hope to be able to get to today is talking about the code of ethics that the project management Institute has asked us all to sign which is basic uh basic types of things that we say we will do some of them are mandatory type of act actions some of them are just kind of think about this and do what you can aspirational is the word that PMI actually uses we'll talk about that and how those can apply to everyday life not just as a project manager so let's talk about what is a project well by definition a project has a beginning and an end and it also create something that is unique whether it's a result or a product or a service or a document it's Unique well but if I have a project that I'm building a house and I'm a house Builder why is it you unque well because we all know every house is a little different if I put in like I did with the CRM project the CRM project for one particular company is very different from another the people they're trying to work with the the tools they have all the things that are there so the project needs to be able to say we are going to start on a certain time we have a Target date a milestone something that we want to get this finished by that may change depending on what goes on because things happen and we know that as a project manager we have to recognize when those things happen we have to figure out what does that mean and how we're going to go about making those changes now a project can involve a single or multiple individuals single is not a good idea but sometimes and in the last one I found myself when I was assigning a resource to a project sometimes it was me sometimes it was myself and sometimes it was I there was nobody else there at the time to be able to do this and I wanted to play a few different roles so I did that we really need to have multiple individuals now how much time those different individuals are involved in this depends on what their role is what the project is and what we're going to need to do we can also have people from different organizational units they could be all within one organization one family one Community or they could be scattered over a bunch of different areas obviously the more that grows the more difficult you may have in trying to manage that project we can also have multiple organizations from multiple multiple units from different organizations especially when we get into contracted work where we end up having people from different companies or organizations working together even though we're in Orange County we spent the last few years in Las Vegas we were there while they were building City Center now if any of you have been over there or have heard about it it was a major effort with a lot of different hotels and casinos and restaurants and Retail Etc there were over 200 project managers on that particular task from 200 different companies now talk about trying to manage just project managers much less manage the work effort huge effort there but that's a case where a project can go from a very simple thing and we always use the the basic example of planning a Christmas party or planning the Thanksgiving meal to cleaning the garage to building a new room on the house those are all projects that just things that we do not necessarily part of the business so if we look at everything that has to be accomplished that we have to say okay we're going to start this now and we hope to have it finished by a certain time we're going to use some basic project management skills as we go through that we can consider that a project when we talk about projects and project management and I talk about PMI PMI is a global organization that's supports project managers worldwide we have what's called a guide to the project management body of knowledge we all call it the pinbot guide and this is a guide that helps us understand best practices of ways to do project management it's a guide it was written by a lot a number of volunteers I started to say a lot it is a lot um it come continually is updated as new ideas are come about as new people come up with new ideas best practices to be able to use it identifies best practices skills tools and techniques not vendor specific but more generic type of things and as a project manager our role is to understand kind of what those tools and techniques bring to the table and whether they're going to be applicable to what we're trying to do the other part of it is it provides a common terminology among project managers I'm not going to necessarily use a lot of that terminology today but we have things like a risk register and a project Charter and all these different things that as project managers when we talk about these tools and techniques and types of documents we have an idea of what we're talking about we have a common base of communication this is absolutely no different from what happens when you're in accounting or a r or marketing we use terminology that is specific and people that are in those functional organizations or within those disciplines know what that terminology means and they can talk back and forth now the key is on this we have a lot of information this book has gone from probably about less than a quarter of an inch to now where it's a couple of inches thick and in fact when we did the latest release I did a presentation and I had had copies of all the older versions CU I've been working with it that long and I brought them and showed okay so we started here and we keep growing because we keep adding more and more to that but the key becomes that is not what we must do that is recommended good practices and the first thing that a project manager and the team need to do is figure out how much is appropriate for this particular project so part of what I'm going to do today is talk about some of the concepts that you need to think through and say do I just need to think about this or should I actually do it and if I do it how much do I need to do when we create a document do we have a one-page document or do we have three three- ring binders full of information you do what is appropriate for the task that you're doing so what is Project management itself project management is addressing the needs concerns of stakeholder expectations now let me go back and explain what a stakeholder is from our standpoint a stakeholder is anybody anybody who cares about what we're doing who may be impacted by the work we're doing it could be the people that could impact us for instance I have a project I want to go redo my lawn and my whole Landscaping in the front yard do I have stakeholders of course I have neighbors I have a group of people within the community that say you can do this and you can do this we have a problem in Southern California with water I'm not going to plant a whole bunch of grass if I have to be able to water and in fact in Vegas there is no much there is no longer grass and we don't have the water and therefore the stakeholder is the Water Association do I need to know about who those people are yes do I need to know what their concerns are do I need to know when to involve them absolutely those are the types of things that we talk about when we're talking about stakeholders and their concerns it's not just me and my project team but it's the people that are going to be impacted by what I'm doing as well as the people that I will impact as I'm working on this noise cleaning up all the things that are going to impact the rest of the community we talk about constraints on a project now regardless what project you're doing you have constraints you either have money or you have time and in some projects we have to figure out what is the most important constraint is it that I have to get this done on a certain date or I have to do it within a certain amount of cost those are different constraints there could also be some quality that says I have to be able to have a quality level for instance I'm doing my landscaping again I have to be able to know how much water I'm going to have to use for that project that's a constraint therefore I have to see how I'm going to water I'm going to have to see what kind of plants I'm going to grow all of these type of things become constraints now it's interesting because most people talk about the constraint of cost and money being the most important unfortunately when I was working in the casinos in Vegas I never ever even saw a budget much less had a concern about the cost everything was scheduled you must get it done on a certain date because of certain things that were happening if I needed more people if I needed more equipment so be it what it cost I never saw and they didn't care the constraint was get it done now what you have to understand when you start out is which one of those are your constraints which is the most important which is the second most because you're going to have to make tradeoffs as you go through so what we do with the projects then is we understand what do we need to do and who do we need to use in order to help get this accomplished now we also have this thing of okay we have projects but we have work that's going on within an organization and we usually refer to that as being an operation it's the day byday work that's done whether it's in a business where you're registering students whether you're presenting courses those are all operations they continually happen now let's take presenting a course if we decide we want a brand new course we use initiate a project to do that we figure out okay when do I need to have it done who needs to be involved in it when we talk about the two of these they both are performed by people they both are still constrained by limited resources and they obviously are planned executed and controlled as we go through this so we talk about project management as I alluded to before there's basically four different phases or four different chunks of work that need to be done we need to start out and the key on the starting out is figure out why are we doing this project who is the one that is asking for this and what do we expect to be able to get out of it now sometimes this doesn't happen sometimes we're not told which obviously means that we could go down a different path if we're not understanding why once we figure out why we're doing the project now we have to be more specific as to what do we need to do who needs to be involved when do those individuals or resources as we call them which could be equipment money people when do those people or those resources need to be involved and how are we going to do this now some of that planning is going to be at a very high level and as we get closer and get more in tune with what's happening we'll get more into oops I didn't know I had to do that or oops as I'm digging up my garden to put in my plants all of a sudden I'm hitting something ended up being a great big concrete piece that who knows why it was there when it got there but obviously we had to get rid of it so part of that was a workaround that we had to do we have to be able to build in the flexibility to say that we're there once we get it finished we need to celebrate we need to say hey we did it good work we need that feedback that positive reinforcement because sometimes that work we're doing it's hard it's a lot of hours it's a lot of people it's a lot of time we opened a casino down in Mississippi for the Indian tribe by the time we were assigned to do it we had 7 months to do the entire thing thing we worked 7 days a week 18 hours a day we actually finished all the it stuff a month before opening because we had to have it in place to train people with my staff was sitting there going okay so now what do we do we have a month before opening I said you sit back and you watch and at the time when that actually opens we're going to celebrate because we did it so part of it is being able to recognize the accomplishments so let's go back to this starting phase I use the term why and I think most project managers will realize this is probably the area we spend the least amount of time on and it's also the area though that bites us later on because if we don't understand why we're doing this project we may not understand really what we need to accomplish by a definition when with in PMI what we say is that we need to officially authorize the project we end up developing what's called a project Charter and it is a way that we authorize the project we authorize the project manager to spend the money I have seen it very very seldomly done even though I force it now because I want to promote this and tell everybody guess what guys we're starting this project be aware of it you're a stakeholder either you can join us and give us feedback and participate in this or you may have some concerns voice them now that's what we need but we need to understand that now in most organizations there is something that happened prior to this project starting there may have had to be a business case which could be very detailed as to the return on investment the objectives how this fits in with a strategic plan go back and talk about if I'm going to add a new course to the curriculum I'm going to obviously have to have some preliminary discussion discussions and approval before this gets started I want to be able to get information from that process and figure out what was the thinking especially who were the people that were really excited about this and who are the people that kind of were fighting it because those are going to be stakeholders I'm going to have to work with so I want to see how we got to the point where we've G been given approval to do this project now let's go back to my Landscaping do I have to have certain approvals obviously if I'm going to dig and put some things in I have to have approvals do I have the money for it where's it going to come from what how's it going to be done versus something else these are all projects we don't formally think of them that way but when we do work when we do and try to produce something or a result it is a project and we need to understand why did we choose this one was it a compliance issue that came down and there was all of a sudden everybody had to stop doing what they were because we had a new regulation we had to meet in that case does it make sense to go try and get a copy of the regulation and read it absolutely figure out why we're doing this what does it mean what impact is it going to have at this point in the starting phase usually about the only person that's on the project is the project manager and maybe a few experts that understand the work we're doing obviously if I'm planting my garden or my Landscaping I'm not an expert in this I need to go at least to maybe the nursery and talk about what kind of plants I need what kind of work those type of things so those are what we will end up having as we start to build our team they're not there every day shoveling and and doing work but they're part of the team they're giving me the information I as the project manager don't know everything I am not expected to know everything and unless this is a project of one which doesn't really work real well I I'm not the person that has has all that detail knowledge I have a team that I'm working with and that's where this whole starting phase says who do you need to work on this and especially if you have to pay somebody whether you have to lease equipment or rent equipment or get people you need to have the approval to be able to do that so we all always say it identifies and formally authorizes the project and it authorizes the project manager to spend resources resources meaning money so should I start a project without having people know that I'm doing this project probably not a good idea unless it's something that we don't really want to get out there yet and we work with a lot of Department of Defense and Department of energy projects in this part of the country where we do have certain projects like that they're classified projects so we do not let everybody know what we're doing sometimes that's not a good situation either so we have this thing called a project Charter there's a lot of examples of this first of all we always say when you do a project Charter you need to do it immediately you need to write this within the first week minimum of when the project starts otherwise you're going to get into way too much detail because all you're really trying to say is why am I doing this project what will make it successful do I have certain requirements that have to be met especially if it's a compliance I know already there's certain things I have to do so put those in here to start out with if it has a constraint of a schedule put the schedule dates in there if it has a constraint on money put the money in there even though we're going to have to figure out the disconnect between what needs to be done and how much time we have to do it and how much money we have to get that work done but we can at least go through there the other thing is does it need to be approved when we get finished and if so who approves it what do they have to be approving so that we know that when we do this it just isn't hanging out there and part of the problem with these projects that never get closed they never receive final approval and therefore they are kind of there but they're not so the key here is stating right up front who's going to approve this and what are they going to use at a very very very high level to say yes you did what we wanted to have done we say that we know who the project manager is what their responsibility what their Authority level is this is a whole area that I'm not going to really talk about here because it's more involved if you're in an organization as to who kind of has the power and control of things if I'm in an organization like in finance and I'm doing a finance project the people that are within Finance have a very very strong control over what's being done uh part of that is being able to see do I have the ability to change the budget do they have the ability do I have to get approval from them those are the types of things that depending on what kind of project and what kind of organization it in makes a huge difference the other thing is who's the sponsor who's the one that actually has approved the funding of this who is the group and it could be a group not just an individual but who is that person that is going to be responsible for paying for this in one a number of projects I've done in the past the reason why we actually wrote this project Charter was to make sure that the individual or the department who was paying for this project knew they were paying for this project because it had been approved six months ahead of time as part of the Strategic plan and they kind of forgot that oh I have committed to this so part of this was to actually get that sponsoring organization and it's really supposed to come from them supposed to be written by them but we know good and well most of us as project managers we write it we let them distribute it but we want to make sure that people understand what we're going to be doing who's going to be involved kind of at a very high level which is why we say write it within the first couple of days or first week now once again we know when we do any sort of writings or any sort of documents for executive shorter is better right one page if you can't put this basic information on a one-page document you've gotten into too much detail this is not the place to go into a huge dissertation about what the project is and everything about it high level introduce a project focus on the most important things as we go through that now when we get into the planning phase this is where we start to identify in more detail this starts almost immediately that's why we want to get that Charter out of the way to be able to say this is the objectives this is the Milestones high level now we can drop down into the more detail what needs to be done who needs to be involved when will things be done and then all these assumptions and constraints an assumption is basically saying I assume that the following is going to be there and therefore I can do my work when I worked for IBM I was told for every assumption there is a corresponding constraint so if I assume that I'm going to have key individuals to work on my project that's an assumption and I've done all the planning based on that assumption but then at the point in time I also have a constraint because if those key individuals are not available what impacts it going to have on my project may be delayed I may have to cut a portion of it out things like that so an assumption is what we're basing all of these requirements and all of our planning on the constraint is what do we know that could go wrong that could cause us to have a problem when we get in here then the last thing is determining how we're going to do this now the how could be how long it's going to take what different roles the different individuals are going to play and there's a lot of techniques that we can use for this entire planning phase and I put the chesher cat up there because this is still my most favorite quote when you get into planning as Alice said which road do I take the treasure cat says where do you want to go I don't know said Alice then it really doesn't matter and that's unfortunately what happens when we don't plan things we have no idea what we're going to end up with we have no idea what we're doing now granted when we're planning something we don't necessarily want to spend months planning something that's only going to be a two-month effort so you do the planning in proportion to the amount of time you have the complexity of the project and we have some ways where what we'll also talk about is that we do some high planning to start out with and then as we get closer in we'll do more detail planning as we go I don't know everything when I start and I don't need to but I at least need to know what roads I'm going to take and that's the key just as an aside I think everybody should go back and read Allison Wonderland you will be surprised how many quotes are in that book that we use every day and especially that are app able to business just as an aside it's just fascinating to read it as an adult so we talk about requirements we talk about what somebody said well what's the difference between a requirement and a specification there really isn't anything it's just a term we use um most often today we use this in what we call facilitated sessions and a facilitated session is where we get additional people people involved we get everybody in the room together so they can talk to each other so they can discuss um the picture we have here actually was a session that we did at PMI a few weeks ago um as part of one of our uh group efforts and we were facilitating different Outreach type of um requirements and how we might do them you're building on information from everybody involved you're facilitating it only to make sure that the information is captured that it stays on track we keep going through there now it says that this requirement should spe be specific and detailed enough to allow verification and validation okay here I'm dropping into the words verification validation verification is making sure we're doing the right thing validation is approving it's making sure that what you asked me to do I've done and you can not the verification would I've been I've done it correctly but the validation is I approve it and we can move on um when we get into these requirements we get into a lot of different things that obviously could take much more time than we have available so we may need to be able to prioritize this um I put this cartoon in here I've had it in most of my slides for a number of years because I think it kind of says if we don't talk about these requirements if we don't discuss them everybody has a different idea of what's going to be produced what's going to be the result and we need to be able to have this so that we can all discuss and make sure we're saying the right thing we're saying the same thing we're all agreeing on it we have this thing called a work breakdown structure and it's kind of everything you need to do and I'm going to digress just a second and I mentioned this earlier one of the areas of of PMI talks about teaching project management as a life skill and teaching it to young kids Elementary the Northern Italy chapter actually has put together a program on project management where they basically do this by means of poits they have a project for the kids to do they give them all Post-its and they say write down the different things that need to be done and then go stick them up on the wall and then they turn around and draw a tree where they can kind of see the different types of groupings that need to be done and everybody goes up and moves their Post-its onto the right branch of the tree I actually did this with my graduate students and I do it when I'm working with a team of customers who've never worked on a project before because they have the ability to say these are the things we think need to be done and this is how they group but it's a physical activity and obviously I don't recognize the new term but um this is part of a new way of learning too being able to do this but we work off this to be able to understand what needs to be done we actually used this because we were trying both my husband and I being project managers decided we better teach our daughters we did this for both of their weddings and we have the Post-its that were on the wall for the different areas that had to be done on the wedding it was kind of a kind of an Overkill in some areas but it did point out a lot of things that we had left out so part of it is being able to understand what's there once we start to understand what we're trying to do now we have to figure out who is going to be there talked previously a little bit about stakeholders talk the project team as we said stakeholders are anybody who could be impacted by the project or could impact the project we need to understand those people we need to understand where they're coming from why they're would be involved in the project what interests they might have what influence they could have on us are there interdependencies between those various stakeholders that well if this one says this this one automatically is going to say the opposite or if I can sell the concept to one they can help me sell it to the second one and what kind of potential impact once again working with some of the dod type of projects that I have or my students have in the past one of my students said you know who my biggest stakeholder and the one that causes me the most problems that's lobbyists because if I'm working on a government project there are lobbyists back in the background that could affect what we're going to be doing they could stop it they could increase it I don't even know who they are I don't know what they're doing they're those blind stakeholders that we have to understand they're out there how am I going to figure out what they're doing I'm still not sure how we do that but at least recognizing that they exist is one of the key now the project team as we talk about it are the people who are actually going help us do the work and I said this could be the fact that I have a supporting expert I have the nursery down the street that I can go ask questions of I actually have people that I can contract out to and we call those the sellers they're selling their services to us I could have business partners in this case you have a partnership here between the university and the PMI chapter that means on this project this effort that had a beginning and an end which will be after today the there these are different people that are on the team they have to be able to communicate they have to have different roles now the customer and who represents them because obviously most cases we can't go to every customer or everybody who's going to be involved in this we have certain Representatives who represent those customers as we go through they're all part of the team they may be part of a core team that works directly on this or they may be an extended team where we continue to move out and get certain people involved when and if needed very definitely in today's world it varies on the culture the scope and the location of these members Erica is working virtually from here doesn't stop anything she's in New Mexico we're in Southern California that is today's world we have to understand that we will have people on our team in different locations we could have full-time people that are all collocated in one location and it used to be this was the preferred way we're realizing that is not happening not available not able to happen anymore so we have to be able to move into either part-time teams where we bring people in where they're when they're needed or we actually go into a virtual world where we have the team virtually connected now virtual teams have little or no none of the face Toof face the actual people being able to talk to each other they're enabled through technology and we all know kind of some of the drawbacks to that not being able to figure out what people are really saying when they're writing an email because of the wording they use or there's no emotion in it unless somebody forgets to turn off the cap locks and you think they're screaming and they're not but those are the things that can really add to a team they can also cause a lot of challenges the positive is you're able to pick up on expertise from people all over you're not constrained to what you have in that local area I could even say that in my case with the go back to my Landscaping thing I have a virtual team it's called the internet I can go out there and get advice from experts that don't even know their part of the team that I'm working on unless I actually communicate directly with them those employees that are working remotely and more and more of this is happening uh different shifts different hours different days sometimes a challenge obviously if you're working with a team member who's over on the other side of the world we have our differences but you could look at it as positive because when I was working in that situation we would work all day we would do testing we'd figure out what it needed what was working what wasn't we sent a message at the end of the day they would work while we were sleeping we would have a meeting first thing in the morning to say this is what we did this is what we were able to do so we in effect were able to work a 24-hour shift by having different members of the team working now did we have to have some meetings early in the morning and late at night absolutely but the benefit outweighed those basic constraints that we came up with the other thing is just the whole cost of getting everybody together it is huge that's one of the reasons why so much of the training that we're doing now is going into a virtual online world because people don't have the luxury or the ability cost wise to be able to go to a location to take a cour anymore it just makes it unable to be done some of the challenges though obviously misunderstanding especially when we have words that are used that people don't understand we talk about a communication model where there's noise between what somebody says and what somebody hears being able to feel isolated there are certain individuals who cannot work in this type of a role and as a project manager we need to recognize this they need that face-to-face contact they need the people connection if you put them out by themselves pretty soon you'll see them leave and they'll go to another organization or another job where they can be connected the technology has a cost to it so obviously if we have one project who wants to have a virtual team and the rest of the projects are all being done in a COO ated Manner and we probably can't do that because the cost of Technology as you all have seen here is very very high but you trade off the benefits of the cost and you look at what additional information can you provide how can you connect people through this technology at that point I mentioned briefly the time zone differences you also have a lot of personal skills that are going to have to come into play and especially when you start talking about how you're going to communicate and how you're going to resolve any sort of conflict and especially even understanding if there is a conflict because if you don't see two people together that walk by each other and will not look each other in the eye because they're in remote locations but they will never speak to each other in however way we have to speak you may not even know there's a conflict there so that's another challenge that we have to look at at now let's go one step further virtual teams that are within a particular geographic area as opposed to globally spread we end up having a lot of cultural diversity which in Southern California is not as great a thing to handle because of all the Multicultural areas and people that we have in this part of the country that isn't the same if you go back into certain other parts of the United States they do not have the E extra cultures the Multicultural environment U people that are in the Midwest and sometimes in the Southeast they've been there for five and six generations and they do things their way it's a very difficult culture to work into we could have a lot of different industries that we don't have especially here in Southern California that we're working with in some of these other countries languages I actually taught a Class A number of years ago for Dow Chemical and I was teaching in uh Holland and I'm speaking in English and then I give them an exercise to do and I walk from table to table and I'm listening to these people and I walk by and they're talking French and then I walk around I come back now they're talking Dutch and I come back a little bit later and they may be talking German and I'm going going okay hold on guys how do you know what language you're speaking in well we all know all of these languages enough to be able to communicate and whoever starts speaking chooses the language they're more comfortable with and the rest of us understand that unfortunately I don't think that's the way in the United States I think we force everybody to use English even if it is not their first language and as a result we have the problem now when I was over there I spoke Spanish I didn't speak any of these other ones well there was one guy who spoke Italian so we kind of could communicate because it was close enough but I felt very inadequate when I'm working with these people understanding you know all these various languages enough to be able to communicate and understand and if for instance something came up and the person that's speaking German got kind of far off and was using ter words that the rest didn't understand they would tell them to switch back and English became the common language but still when they're doing an exercise when they're working like that the different language makes a difference so part of what we have to do when we're working in this virtual and especially Global this is even more important to look at the effective communication cuz that communication has to be timely it has to be clear and how do we know if it's clear we need the feedback to be able to say did you understand what I just said because a lot of times what we think we've said obviously doesn't happen we also need to be able to have this Mutual Trust of each other we need to be able to work together and yet interdependently so that we can get the task accomplished okay so once we identify what we're trying to do and who's going to help us do it then we have to start figuring out when unfortunately I think this is all that people think project management is it's a Microsoft Project schedule and it's not it is not at all you can do a schedule without using a software tool and in fact those third graders after they took a picture of their tree then they asked them to take the Post-its off and go to a different wall and put them in the order in which they needed to be done guess what that was their schedule they were able without saying anything about dependencies or any sort of relationships or anything else I need to do this before I can do something else they knew that we all know that you know you don't plant bulbs until you've dug up the ground and put some good dirt in well you can but you might not have anything grow so part of that you have to understand yes a lot of times we do use a scheduling tool to help us do this because it allows us when we make a little change to be able to figure out what the impact of that is so what happens if it rains and it actually does rain in Southern California and there's certain things that get delayed as a result did we put anything into our schedule to say okay if it rains on next Tuesday what am I going to do well next Tuesday we might have an idea it might rain even though doesn't mean it will but next month is it going to rain next month don't know is it going to snow in Las Vegas it did a week ago it did a couple of years ago to the point where it closed down the airport do they now start putting things into their project to say during the winter time it might snow and if it does it's a major stoppage so what we have to identify is what do we need to do to be able to figure out taking what we have to do who's going to do it we have to figure out now when when does the task need to be done when are the resources going to be available to do that the one thing we always laugh about is the fact that if something has to be inspected that's probably going to throw your project schedule off more than anything else because you have to be completed with what they're going to inspect before they come to inspect it and if they don't come when you've scheduled them to come who knows when that inspection's going to get done and go back to city center they're taking apart one of those buildings Brick by Brick or wall by wall because it wasn't inspected at the right time and the inspection wasn't correct they can't implode the building but they have to take it down because the inspection was not done at the proper time and they continued to work so once again we have to understand when things have to be done we have a couple of methods we talk about critical P critical pain you've all heard about the critical path it's the longest path it's the path these are the things that have to be done and if anything's delayed your whole Project's going to get delayed and we try to make sure we manage that that that path there's also this thing called critical chain and if you're not familiar with it I highly recommend that you read the goal go by gold blot he talks about this as being a it's a theory of constraints but he writes it as a novel as a story and you can visualize what has to be done but the IDE idea is that there's certain critical resources and if they are not available and if they're not working and not there when they need to be done they impact the whole thing and he talks about what you need to do to be able to keep the project moving now do we have critical resources on our projects absolutely we have somebody that has to come do something and if they're not here this thing could have a problem I think in some cases I'm one of those critical resources because if I hadn't been here on time this morning this might have had a problem could I do it virtually over my phone as we're driving up the freeway um probably not the same quality part of what we have to look at is do we need to put some buffers in do we fancy word to say we need some wiggle room we need some things put in there so that we make sure so I come early to make sure I'm here on time don't want to get into to that portion so once we figured out what actually after we figure out the why then the what the who the when we start to talk about how we're going to do this and there's a number of different approaches that we talk about and then there's a lot of detail that we can choose I don't want to go into a whole lot on this but just there's terminology and there's Concepts here that we probably need to understand there's what we call phase-to-phase relationships where we have certain things that have to be done and until we are completely sure of that we don't go to the next step obviously you don't start building a house until you have Blueprints and you have certain blueprints approved now how much do I go into where my closet is on that blueprint if I'm building a house probably do I understand how the closet's going to be laid out where the rungs no I'm not going to get to that point yet but I do have to have certain things that must be completed in order for me to go to the next step that's what the sequential is talking about when I get into the overlapping it may be that I say okay well we have the blueprint for this portion of the house but we don't have the upstairs blueprint yet we know the basic we know where the loadbearing walls have to be so we can put those in but we're not going to do the rest so we start to overlap some of these in order to shorten the lake that schedule we have a new one that we talk about when we talk about adaptive life cycles and this is usually applied to Agile and I don't want to spend a whole lot of time on agile but I do want to talk a little bit about it because in our world today everything has to be shortened everything has to be smaller has to be faster we've got to get this out well the problem is is when we do something like this if we wait let's go back to the course itself if we wait until the course is totally developed before we start doing the marketing for it we're going to have some problems because we're going to have it out there and then we have the marketing for it it could also be that what we do is let's say it's a three session program what we may want to do is say let's get the first session and then we can determine what worked what didn't work and then we can rep prioritize what the second session is because maybe what we learned is that what we thought originally was going to be part of the second session is really not as important as a few other things so we basically chunk the work into smaller groups and say this is what needs to go first we'll try it we'll see what works we'll prioritize that when we get to the next one we kind of know what we're going to do but we figure out that wellbe maybe we rep prioritize a little bit we change some things of the way we did it so it works better these are what we call iterations we usually have a fixed time that says we will do what we can in this amount of time or within this amount of money and then we'll when we get to that point we'll decide okay what do I do next so rather than Rel Landscaping my entire house I may say okay I'm going to concentrate on the front yard I have this amount of time I have this amount of money I'll do what I can and then I'll decide okay now in the next iteration do I do more in the front yard or do I move to the backyard where's my priority so I'm able to change and adapt this especially has to be done if you're working in any sort of marketing effort because the world changes so as we said we take this information we pre reprioritize it we figure out how much we can do within that period of time and then we incorporate some things that are probably some of the best practices for project management and that is what they call a retrospective review at the end of each one of these time periods the whole team sits back and says what did we do right that we need to continue doing what could we do better and let's immediately implement it on the next time not wait till the entire project that takes a couple of years to be able to make that but to be able to go through and do that so once we've done the planning now we can start performing at wrong once we've started the planning then we can start to perform because we're always going to overlap actually I went go back here a second because I had another couple of words in here and I realize I don't have the slides for them and that has to do with rolling wave and Progressive elaboration they're really fancy ways to say how am I going to figure out what I'm going to do and I mentioned this that I don't always know exactly what I need to do at the beginning so what I do is I put almost like a timeline together and I say okay I think and I'm going to continue to use my gardening exercise you can tell where I've been the last month or so um it's spring I had my first daffodil this morning so spring is officially here um but we'll lay out this and say I this is where I'm going to start the front yard then I think I'm going to go the back then I think I'm going to come back to the front Etc so I have that line out there I know that there's certain things that I do on the front yard that are going to also be done on the back because I'm doing kind of the same thing so I will put information at a little bit l L detail for the backyard now what I do third maybe I know what it is and maybe I don't even know maybe it's just a placeholder to say okay that's phase three I don't know what I'm going to do I'll figure out when I get there that's rolling wave rolling wave says you concentrate on what you're doing now you kind of know what's going to come next and you may have an idea of the out time you don't try try to figure out everything right now because things change regardless which methodology you're using now Progressive elaboration rather than going across goes down so I'm now doing my front yard I know that's what I'm doing I need to very detail go into exactly what needs to be done when I get to the backyard I will do the same I will drill down terminology we use in business intelligence but I will get more and more detail when I get to that point in time so when I'm doing the planning regardless what kind of project you're doing you need to figure out what do you know what do you think you know kind of what's out there in a vision of the future but don't waste the time trying to drill these other two down at this point in time because I don't know enough concentrate on what you're doing right now allow yourself the ability to make that modification so that's why when we talk about moving from planning into performing or doing we actually don't completely finish planning and then move on to actually starting to perform we start the planning we start the activities that need to be done and then we look at how that as we're doing the work how does that apply back to what I said was going to be done now go back to my cheser cat if I don't know where I'm going then I guess I don't need to figure out I can go any place well I also don't know whether I've accomplished anything either so part of what we do in the Performing phase is we look at what we said we were going to do and we look at what we've actually accomplished and when it rains we look at and say oh shoot I was supposed to be here by this Saturday I'm not so what do I have to do I have to make some minor adjustments now if I had enough wiggle room in there to say okay what I was going to do next Saturday I could either do next Saturday or the following Saturday that's fine based on resource do I need to contact them what do I need to do so what I'm looking at is what I thought I was going to get accomplished and what I've actually been able to do and what adjustments I need to make now sometimes we have to be a little hard noos and we have to say that was not in the original plan now that's a project manager's job in my case I have a sub project manager who's the one that tells me that wasn't what you originally wanted to do that's a change request you have to get it approved you know because he's a project manager too we talk this type of language at home unfortunately but it's a case of saying this is what you said you were going to do don't change your mind Midstream without figuring out what impact it has on what you said you were going to do now once again go back to that agile out approach agile approach says I only need to be able to concentrate on a short period of time like two weeks and therefore if I do that I know that during that time this is what I'm going to work on when I get to the end of that I will rep prioritize now what I'm going to do in the next set of time that way I allow change to happen but not when I'm Midstream in doing something now granted things can happen you may have to I mean when we get that piece of concrete that was not in the schedule I had to do something about it so we had to look at it and say okay what impact is this going to have on us how much time is it going to take away from what we had planned do we need to go get some other piece of equipment to get this thing out of the the dirt those are all the types of things that you do when you manage change we talked about very strong management of change to be able to work through this but the key during this time is communicate communicate with everybody communicate with the people on the team communicate with a sponsor communicate with the stakeholders if I'm working with things I I'm talking I'm communicating now communicating can be written can be verbal can be different ways depending on what I need to do one of the tools we use and this is a little detail but we need to figure out when we put this plan together we will never ever do it exactly the way we said we were going to do it just is impossible even if you've done this type of project 20 30 times think about a pilot taking off a pilot takes off he's done it millions of times he has a checklist to tell him what to do he also keeps track of when things are not exactly the way they're supposed to be but he also understands that there's some wiggle room between what it's supposed to be and what is still allowed obviously with the crash that we had a couple of days ago up in Santa Monica there was a case where the pilot understood the problem was farther than the allowable variance and he started saying I have a problem I need to go down I need to go back so part of that is understanding where I thought I was going to be where I am and is that within that R wiggle room or do I need to correct something to get it back on track or am I seeing a problem that's starting to occur and therefore I'm going to have to put some preventative things in to make sure this doesn't continue to occur and that's part of what we're doing in here once again we talked about those change requests when I'm on a a project within an organization there's a there's always going to be change that's going to have to happen and we talk about there being three types of changes one is a corrective action that's where I need to fix something that I'm doing today that's not really being done correctly it may be I have the wrong resource it may be that I need to reschedule some things that's a corrective action a preventative action is being able to make a change so that things don't continue to go south so that they get better as we're working through preventative measures that we can put in place to make sure we stay on course the last one is obviously there's a problem we need to fix it and that fix may take time may take resources may take money whatever it is happening we need to be able to fix that well if we're not monitoring what we're doing we may not realize that we have defix out there we have just gone through and seen a lot of situations where companies are in really bad trouble right now because they weren't on top of things that were happening or they knew about it and didn't communicate about it and therefore being able to fix those defects because they waited so long to do it it made a huge impact just to the company itself and the brand now one of the things that we talk about as far as a project manager two key things one is they want you we we should be preventative and proactive preventative in trying to make sure we prevent problems from occurring either because we put things in place we've put time in our schedule so there's some slippage there in case we need it but we also need to be proactive we have to be looking for things and trying to stay on top of it rather than sitting back and saying okay well the Project's going fine I'll wait and see if somebody comes into my office and tells me there's a problem and then I'll figure out what to do it doesn't work we've got to be able to stay on top of things and see that something is happening now obviously I fly a lot when I'm doing a lot of my teaching because I fly a lot I realize certain things happen I know when a flight is going to be cancelled before anybody ever says it because I'm proactive as far as listening to what's being said I was traveling with a a team member a few months ago and I said to them I said look we're going to have a problem I can tell you call the rental car company and get us a rental car I will call the hotel and get a hotel just in case we were ahead of everybody because of that because I was able to be proactive I also knew that on the rental car I could cancel at no cost the hotel we waited a little bit longer cuz we knew we would incur a a cancel cellation cost so when we talk about one of the other pieces that I mentioned the effective communication I guess the most important thing to say is that first of all you need to be as concise as possible especially in Communications that are telling people what to do what you expect to have done Etc so it's right there you need to put it in the right format whether it needs to be verbal or written if it's within a contract it's usually specified how things have to be communicated making sure it's done at the right time not waiting until later on and saying oh I should have told you that but you know what I was busy and things were going on making sure it's the right impact let's not scream wolf when it doesn't need to be if you start doing that screaming wolf what's going to end up happening is after you've done that two or three times nobody's going to listen to you anymore so you need to understand how important this communication is who it needs to go to Etc as we go through that and then the appropriate context depending on who we're communicating to obviously most of us in business have been told do not send anything out to the general public let somebody from public relations or whatever determine how it's going to be worded who's going to say it not you so once again that the appropriate contact we need to have because communication is so important this is probably the one plan that I do on a on a real project within a business and what I'm understanding here is two things who do I have to communicate to and what Communications am I going to deliver to those people how am I going to deliver it what method I'm going to use the amount of detail because obviously if I do a status report the status I give to one individual may be very different from the amount of detail that I give to a higher manager what is the time frame how often do I deliver this information we all get these emails that are blasted out to us telling us about meetings or whatever and sometimes they are way too frequent and to the point where we get so many we start to ignore them so we have to once again look at when we send it out how often we send it out who are the people that are going to provide the information to you so you can communicate it out and what information do they need to provide when do they need to provide it to you so you have time to compile it to put it out I put this constraint in here before things that were happening right now um within the government because it's very important to understand what are the rules and regulations regarding Communications what can you say how do you say it where is it kept what are all those various things that you need to know every organization and greater um within the type of business have regulations regarding Communications now as a project manager we all need to be familiar with those now also we talked about timing of people that are coming in to inspect if you have to have approval of a document before it can be sent out you need to figure out how long it's going to take to get that approval because if you say I'm going to get the information on Thursday send it out on Friday and I'm going to assume that three people are going to be able to sign off on this so I can get it out by end of day Friday and one of those people are out of town what do I do so I need to be able to figure out what is the workflow what is the steps that have to be done to get that thing approved before I put it out so I have the work it's progressing we're going to assume at this point in time we did what we said we were going to do at least for the first phase so we're going to celebrate but before we celebrate there's a few things remember the old cartoon that nothing is done until the paperwork is done that's what we're talking about here um we need to be able to say what did we do what worked what didn't work work taking all of the documents all the information that we need to putting it away why because we hope that when we do the next project we can find it I'm a hoorde on paper I'm a hoorde on things that I've done I probably have a copy of every presentation and every course I've ever taught because there are times when I'm looking for that one picture or that one sentence that was on something that I want to reuse and that's what we're talking about here taking what you've done and putting it aside so that you can learn from it or other people can learn from it also we talk about if we have people that are working on a project it's really important for us to give feedback back to their management as to how they did what their involvement was doing recommendations I mean even as much as LinkedIn how how important is it if somebody is looking to potentially hire a person they go to LinkedIn they look at the recommendations that that person has received that's exactly what we're talking about doing an assessment an appraisal of whoever's been doing that to be able to give them some information that they can use future they did a hard they did a a really great job maybe they didn't do as great a job but you can always find something positive you know if you can't say something nice figure out how to say something nice you know you have to do that and then we celebrate the project success we have a time now granted more and more organizations are cutting the budget for that there's ways to celebrate without spending a lot of money so part of this also is to be able to as I say validate I need to have what I said in the beginning I was going to do need to make sure that that actually has been completed and approved and I'm going to do a comparison between what I said I was going to do versus what I have okay some of these are some of the deliverables I want to keep track of things that were not approved because I want to be able to go back and say why were they not approved what do I need to do to not have that happen again so as I'm going through this validation process I'm trying to make sure that everything we say said we were going to do has been done and accepted there's also this last piece that has to do with what we call administrative closure that's the paperwork and I know we all hate it and I know we all try not to do it but it is so critical for us to be able to take the time to put this together both for our own standpoint of understanding what we did but also to be able to say if we want to do this again in the future and maybe it's not do this exact thing but it's something similar what can we learn from it so being able to put that all together now now that the Project's finished we need to sit back and look at ourselves as a project manager and what are the types of competencies that we need to have as a project manager first of all if we are truly a project manager and managing a team and an effort we probably need to have some idea of what we should be doing even if it's just to that high level of understanding why what who when how and then actually monitoring what's going on but we also need to be able to perform we need to be able to figure out how we're going to accomplish what we're doing now once again unless you're a project of one person you are talking about working with other people you're talking about being able to motivate those people to be able to communicate with those people as to what needs to be done effectively so they know exactly what you want done as opposed to picture of here's what I want and here's what you think U being able to go through there there's also some behaviors that are really critical and they are becoming more critical in today's world and that has to do with some of the attitudes we have towards each other as a team between our stakeholders and ourselves some core personality characteristics that we need to be able to realize when we're managing or leading it's a diff it's very different than doing everything on my own when I'm only trying to tell myself what to do I have a almost 2-year-old granddaughter and watching how she's learning and how she's picking up characteristics from the people as she comes into contact are shaping her personality now she is exposed to a lot of different people and as a result you can see she has a very broad spectrum of how she communicates with different people and how she reacts to situation the other thing is as a project manager we know this project has those constraints or at least we should have figured out what those constraints were and we need need to be able to figure out how we're going to get from the why are we doing this and what are we doing to actually accomplishing it and yet staying within those constraints now as we said when we start looking at the constraints of cost and time maybe we have to make some tradeoffs there and those are things that we have to know when I was working on a casino in Mississippi after Hurricane Katrina the executives decided we will reopen one year to the day of Hurricane Katrina and I'm looking at what needed to be done going there is no way we can get all of this accomplished I mean this was a major casino and so I started saying okay so what are some of the things that I might be able to delay and how am I going to put together a story to sell this one of the things that if you remember Hurricane Katrina hit the end of the summer well if you look at a retail operation especially in Casino the end of the summer they're doing a sale to get rid of all their merchandise between before they bring in their Thanksgiving Christmas stuff right so I thought hm why don't I delay that opening of that retail from August until at least October that way I have a don't have to concentrate on it right now and I can put it in here so I knew even though I had a constraint when when the CEO said we will open one day as to the day that the hurricane hit he didn't say what was going to open so I use that as my opening to say okay so can you tell me do we need all 13 restaurants open on that day or can I open just the buffet and the steakhouse and the coffee shop and then maybe open the next one a month or so later so I can do this rolling wave progressive labor ation things without using those terms for him but the idea of being able to look at the constraint and figure out what do I do to work within that constraint so what PMI has done is they have started to move from that technical these are the things that the project manager must do put together a charter and a schedule and a scope and all of these variances and start to look at these things called interpersonal skills they're also known as soft skills they are competencies to help project managers and leaders and people in those type of situations be able to better handle some of the ways that we need to work some of them have to do with emotional intelligence and I'm not going to go into this here but this is an area that every should have at least a basic understanding of what emotional intelligence means and how to apply it when you're working with a group and especially as a leader of that group the group facilitation we mentioned that earlier this is an area where learning how to be a facilitator learning how to get people to interact and communicate and and put ideas together huge skill that needs to be done it could be looked upon as a technical skill I don't I look at it as more of a way to get things accomplished the last one talks about the balance of ethical interpersonal and conceptual skills that you need to use as you look at things that are occurring and how are you going to react to it obviously you can look at it and say well if I ignore it it's going to go away no what's the impact what do I need to do ethically as well as for the better of the entire group in the pin boach that I'm mentioned earlier there's an entire appendix now that has to do with these different skills skills on leadership skills on team building how do you build teams how do you motivate teams how do you communicate what are the different ways of communicating delivering the right message to the right person at the right time how do you influence people without being a dictator but still being able to get the job accomplished how do you make decisions are they going to be group decisions are they going to be okay I have a majority that rules or am I going to have a plurality and let people that have different things go understanding political and cultural awareness depending on the project you're in depending on the organization depending on where you live this is all something that we need to be able to understand understanding a little bit about negotiation give and take that win-win situation versus a win lose situation I read recently where they said something about on a team don't do a competition because when you do a competition somebody loses and as a result do something so everybody wins as opposed to this person winning and this person losing sometimes we kind of do that without think we need to look at that how do I build trust what are the different ways how am I looked upon as a project manager am I looked upon somebody who's an expert in project management or an expert in CRM I obviously wasn't an expert in putting in a phone system but by the time I had to do that I had another skill that I had because of my other work I had the expertise associated with me to say we can handle this how do we handle conflict management huge term huge concept and something that we can talk about at later time how do we coach how do we Mentor other people because regardless even when I was trying to teach my daughters I was helping them do their wedding but I was also trying to coach them and Mentor them and trying to break down what need to be done reduce the stress level as to different areas as we went into that kind of one last thing I want to talk about PMI has this code of ethics which is a code of conduct that is meant to be applied to all project managers who either are part PMI who have a certification who volunteer with PMI and it's mainly to be able to make sure that if an organization has a project manager that they can understand they follow certain rules it also helps us as individuals look at that ethical decision when should I do something something should I not especially conflict of interest and then being able to look at it profession wide project management is a profession there's a lot of people the PMP which is the project management certification is 30 years old this year there are thousands of people that are certified there's thousands of project managers there's also a need for even more in the future we know we don't have that but we need to understand how we should act code of ethics basically has four aspects to it it has the aspect you must be responsible you must take on the responsibility to do what you say you're going to do you need to respect the people that you're working with your team members your stakeholders everybody you have to have that respect for them you need to be fair you can't take and have some people do things that you don't have others making that fairness and last being honest telling the truth not lying not covering up as we go through so as we say you know we have both aspirational and mandatory standards the mandatory are things that we must do like we must not cheat we must not lie if we have a contract we have to meet the needs of the contract you don't have the conflict of interests things like that in fact well most of us have to sign an additional conflict of interest statement every time we do anything um which is fine I found this quote by Roy Disney and I thought it was really critical or really appropriate it's not hard to make decisions once you know what your values are and that's basically what this is it's being able to understand where you should be going and therefore where do you want to go okay I'm going to skip this because of time um just one last kind of plug PMI has a Academic Program they present um that's part of why I'm here because that's what I represent is the Outreach to the academic community community we have a number of different things that we are doing as far as um material Etc um but trying to work with both the practitioners that are becoming project managers students especially people that are like mbas that will become a project manager when they get a job whether they hold that title or not because they will have work that has to be done anyway I hope that I've at least been able to expose some of the concepts of project management um to you and be able to have you understand some of the basic good practices that we have that we try to do I thank you greata thank you so much we'll take some questions now I'll start with some questions from our uh uh virtual attendees and give our inperson audience here a chance to gather their thoughts uh the first question comes from uh someone who's interested in the field and had a question about uh the best uh path to take best career path and the question is if if project management requires both project management skills and knowledge in addition to knowledge of the particular field whether it's manufacturing or Logistics or it or whatever it might be um what what typically is the path do do do project the project managers that are out there do they nor develop the project management skills first and then add the substantive skills or does it tend to be vice versa where there people in the field that then add project management expertise on on top of their e expertise in manufacturing or it or whatever the case may be well I'm looking out some of the people here that are project managers saying okay I hope I say this right let me tell you where I came from okay I started out working on a project I started out as a programmer years ago became an analyst designer and then moved in to more of a team leader type of thing so in my thing is I think you either have a direction that you want to go that incorporates people and teamwork to get things accomplished as opposed to being that person that sits and is kind of a loner by themselves um as a result I mean somebody who's a technical person who just is really happy sitting in a corner doing code or laying concrete or whatever may not have the the desire to become a project manager whereas if they get to the point where they want to start maybe moving up and managing the team that's where it kind of goes so there are certain skills there are certain bents I mean we see a lot of project managers who know the tasks but they don't have the people skills it has to be a mix of the two great um this this question gets into some of the softer skills you were alluding to towards the end of your presentation uh this this learner outlines a particular situation as a project manager what do you do in a situation where you have say an eager team member who wants to take responsibility for an area where he or she doesn't really have the appropriate skills and uh the project manager might uh prefer to bring on someone who uh is a little more experienced in in this area is the project manager's responsibility solely to make the call that gets the project done most efficent efficiently or in that scenario might there be some room for uh softer considerations like the morale of that eager team member or helping that team member build additional skills yeah I mean I look at it and say very seldom was I actually able to determine who was going to be on my team I usually walk into a contract situation especially where the team is there and I have to work with those people some of them being overly qualified and therefore thinking they can do this stuff by themselves so I let them teach me if they if they think they're over I mean if they think they really know what they're doing they're eager hey give you know participate with me now on the other hand you know can I map or match them up with somebody that doesn't have those skills or for instance let's say they have the technical skills in an area but they may not have some of the soft skills that are needed by pairing them up with somebody that they can work together to kind of rub off on each other but I think the key is when we work with team members we have to get the job done yes but we also have to make sure that the team that is working on here um actually can can accomplish it and very seldom do we have the ability to choose who that Pro who that team member is as well as being able to release a team member that's the sticky part is that at point what point in time and I've had to do that in a couple of situations where where I've had to figure out how how to move that person off the project while still allowing them to save face so a lot of times it's a matter of finding another project that I can say is more critical here you go type of thing but I think it's the project manager depends on once again that organizational structure I didn't talk about that depends on a lot on how much responsibility and Authority the project manager has for that team another question about the uh the field more broadly how uh how do Business Leaders today in your opinion value kind of formal project management skills in other words are they increasingly likely to hire or engaged a trained project manager or are they uh or as opposed to being apt to just make the assignment to someone in that in the relevant department does that make any sense yeah it makes a lot of sense and I think a lot of it has to do once again the organization structure working in because in a functional organization we talk about the fact that most often the projects are done within that functional organization they're managed by the functional manager not really a PM and they're they're staffed by the people within that function um they don't really a lot of times have those skills now also there's a cost Associated and we see that a lot of times and I think one of the reasons why unless you have an organization that does a lot of projects you will not not necessarily see a full-time project manager or project managers in that organization they will be brought in to be able to help manage that project and when the project is completed they're let go which is what you expect I mean it's a start and an end which is personally why I like being a project manager I don't like the day-to-day operation I like the idea of I have a project I have something I have to do I get it done and I think that's something that some of us feel the same way any questions from our audience just one so um I just wanted to ask what is the best possible way of answering the question on what are your weaknesses so I'm a project manager I go in for an interview and I know uh you know I I may be having a lot of weaknesses which of course I have but how should I best possible answer this question on what exactly are my weakness because now I'm there to sell myself and not tell them my weaknesses right but if I am asked this question how do I handle this and probably not the right person to answered that because I would be struggling with the same thing a part of it you know when I talked about why the more research I can do on why they might be hiring me what kind of organization is what kind of skills they would expect um and therefore being able to figure out that okay these are the things they expect and I know I can do those those maybe something that's not that critical um you know one of my weak skills is I'm a procrastinator I know that but I get things done but I also realize that's really not the best way to do things because the more we wait till the last minute that whole student syndrome idea and we get under stress we don't do as good a job as we might but you know that's probably a question that other people here could help answer even more um but you're right you're trying to sell them your positives and the only thing might be to to say okay let me think if these are my positives so that I restate them then let me see if I can figure out something as I'm restating my positives to be able to State what my weakness is I mean that that would be the thinking process I might go through hi Greta thank you so much for the presentation I took several pages of notes um so my question to you is you mentioned that um there's a greater need for project managers what do you think is fueling that need just the fact that I think there are projects that need to be organized to be done I think what happens is I because of things that have to be done especially in a very tight time frame that whole idea of being able to get somebody who knows how to organize it and get it accomplished as opposed to and it goes back to the the previous question about can we just use somebody that's there um if they have knowledge of what has to be done probably those skills of managing and keeping things on track could be supplemented by somebody else and a lot of times they are through kind of a project management assistant or some sort of coordinator type of person to do some of that um hard skills the hard tasks that need to be done but I think a lot of it is just a matter of everything is done in a shorter time frame now we have those constraints of time and cost and so therefore being able to have somebody that can organize it and make sure that they stay on top of it um and not just expect everything to happen and I think that's part of where I I guess the organizations and I look to you too to say you know do you kind of agree with that as to why we have projects oh yeah I got a follow question just a follow-up question on what Amber just asked do you uh see a greater acceptance within industry of the value of bringing in a project manager oh absolutely I think that once again um most organiz organizations realize that when they take upon a project I mean even that phone system being able to have somebody that could stay on top of it they're looking at how much money they're putting out and they want to make sure that it gets done and that it doesn't get out of budget and out of control so um once again the types of things now in my case I tend to be able to see that well in order to do this project you need to do these other pieces of it so it's what we call a program but that's neither here nor there but the idea that yeah having a project manager to not have to worry about that day-to-day operation they're assigned they're put in charge of this and you can assume that it's going to get completed then I have a question it's um kind of along the lines of the time constraints um if you're dealing with a project it has a strict time constraint and one of the tasks maybe a task along the critical path for example is you feels running behind do you have any tips for a project manager to try and light a fire so to speak to make sure that that task um completes on time so your Project's not delayed well there's there's two activities that we use in that case we call it schedule compression um we talk about the idea that sometimes being proactive and preventative if I know that's going to be happening which I should I should be able to see ahead of time we're going to have a problem here I can either maybe start it a little bit ahead of time I run some risk that we have to do some rework but maybe I can get pieces of it done ahead of time that's one thing the other thing is what we call crashing and that's where we throw more people on on to it now obviously at some point in time you reach this case where you have too many people and the communication and everything that needs to be done starts to go south but those are some of the things I I think the in my mind though it's being able to understand there is a potential that this is going to happen so I have time to think out the different Alternatives that I need to do rather than waiting until all of a sudden I see oh my God not going to make that and you know working backwards from that time of when it's there like I said when I opened the casino I ended up actually telling my team I know what the date of the opening is but that's not your date your date is a month before and actually in some cases even earlier because we have people that need to train on the system we need to have people that can do this so I worked those different dates I knew I had wiggle room in there and that's the other thing I I always have that's my official term is wiggle room I always put those type of buffers in there so that I can handle but staying on top of it realizing it may happen I'd rather be able to be proactive and try and figure out that it may happen and what might I have to do perfect example you're driving up here you have a time you're supposed to be here at a certain time okay do I listen to the radio to listen to the traffic yes so I know if there's a potential problem coming early there's all sorts of things you can do to be able to be that proactive and those that just has to be kind of in your nature Greta thank you for a wonderful presentation and um you brought to bear so many points that are so important for project management and I I like the comment that you made about how project management you know is so much more than the schedule and you really need to look at look at all the phases and then on top of that talking about the the sofware skills and my question for you is you know looking at all of the um you know the softare skills that are so important and having worked with so many different types of project managers you know what would you say are really the most important you know soft skills that a strong project manager really needs to have I think the first is being able to communicate and the other is being able to work with the team being able to understand the team members being able to encourage them motivate them Etc as we go through but I think you have to be able to communicate and to me communicate is by walking around not sitting in my office I never ever was in my office now once we ended up getting the cell phones you know they could still get me all the time but I need to be able to communicate with people I need to understand what they're saying what they're doing where they're feeling things like that understanding that and then being able to figure out you're behind schedule what do we need to do to get to motivate you to get this done do we need to add more people do we need to figure out what's going wrong what do we have to do so I would say those are the two main ones that I would see you agree I think we can squeeze in two more can students benefit from joining PMI he's a PMI member and since we're doing it question I will I'll mention PMI has a couple of different memberships one is for those of us in the profession it also has a student membership and the student membership for a full-time student is very very reasonable and through that not only do you have attendance and and capability to be part of these groups be mentored being able to volunteer and work with with experienced project managers the pinbot guide that you saw up there is free in an online version to anybody that's a member of PMI which means if you're in a project management class it probably makes sense for you to download it free of charge rather than paying the whatever $80 $100 that it cost there's another website that PMI just AC acquired it's called projectmanagement.com now it is a fantastic resource if you're not a member there's a lot of free information out there you're a member of PMI even a student member you have access to webinars you have access to templates you have access access to thousands of things that can help you and as a student if I have to put together a project there's a lot of resources out there that are available to me so one of the things that that we look at is is the ability to get students a little bit more uh involved because students are our future project managers um when we were in Las Vegas our students were our volunteers for all of our organizations as a result they were seen by the people in the chapter and almost every one of them got a job after graduation because of that contact that they had made the references that they were able to receive for that volunteer work that they did so um yeah I we push very hard um as far as being able to be involved it's a great group of people we just spent four days on a cruise which unfortunately is not my favorite way to do presentations and the pictures came back with me hanging on to the podium as we were rocking back and forth but being able to work with other people other key people that have gone through similar situations it's a great networking opportunity and for students as well as for people who are looking as we say in transition between jobs I just have a quick question and that is basically when you're working on a project and you're working with your team what incentives or motivational tools do you utilize um well one of the things that I used to do and I don't know if it's still appropriate but whenever I had my staff meetings once a week I would always have some sort of little candy bar whether it's a Payday or a million dollar bar or something and I would recognize somebody who did something well or somebody who had made a mistake but admitted to it so that we could make an adjustment to it but just that little recognition now obviously there's other things that we can do to motivate but there's a whole theory of motivational that we we study because you have to understand where a person is to be able to understand what motivates them so for instance if I were to say to Robin for instance guess what you can work from home virtually but she's the type of person that doesn't feel comfortable unless she's in an environment with other people that motivation which I thought would have been a motivation and a benefit a reward ends up being a penalty because that's not where she is so we have to understand where people are what motivates them you know sometimes you know a $25 gift card motivates people and sometimes that's not what they need so um you have to under this goes back to that emotional intelligence I need to understand my people I need to understand where they are what's important to them the sympathy the emotion that I have to have in order to to I guess not as much motivate them as to make sure I don't demotivate them if you notice on the slide those of us that are project managers as part of our certification have to have so many hours of continuing education and we have the pdu numbers that you would have to have to record this just like you have your students as a project manager certified project manager so the the event number is up there on the date and number of pdus so and on behalf of the entire Institute I'd like to thank both our partners at uh the project management Institute and Greta for a fantastic and informative presentation thank you so much

Seek backward 5s ←
Longer seek (10s) Shift ←
Play Space Seek forward 5s →
Longer seek (10s) Shift →
0:00 Auto-scroll A Copy link at current time S

The Basics of Good Project Management